Retail Fit-out from Fischer's workshop — planned, built and installed by one team. Our retail fit-out comes out of the same hall where we make furniture, kitchens and stairs. No subcontractors, no three-country supply chain, no compromises in the detail.
Every fit-out project starts with an on-site survey. We measure to the millimetre, check walls for plumb and ceilings for height, document conduit runs and sockets. We then draw the piece in our own CAD; you receive plan and 3D view. Only once the drawing is right does the piece go into build.
We work with solid wood and veneered panels from PEFC-certified European forestry. For visible surfaces we use real veneer only — no foils, no prints. Finishes are oiled, waxed, or left raw; on request fire-rated (B1) or acoustically perforated.
Installation is handled by our own crew with truck crane, scissor lift and dedicated jointing tools. For larger works — retail fit-out, office build-out, hotel interior — we coordinate directly with architect and site management. Handover protocol, care instructions and a five-year snagging warranty are standard.
Frequently asked about Retail Fit-out
Answers to the questions we hear most often — pricing, materials, process. If something is missing, just call.
From briefing to opening, plan 12 to 20 weeks. About 4 weeks for concept and planning, 6 to 10 for workshop fabrication in Samplecity, and 2 to 4 for on-site build. For time-critical openings — seasonal retail, centre-management deadlines — we run multiple shifts to hit dates.
Focus areas are high-end boutiques (fashion, jewellery, eyewear), concept stores, wine merchants, confectioneries and showrooms for manufacturers. The needs overlap: warm material, precise lighting, considered product display, a counter that becomes a brand anchor. Pharmacies and medical practices with premium standards also work well with us.
We do the lighting concept ourselves — track systems, LED spots in display units, accent lighting in vitrines — working with regular electrical-planning partners. The actual wiring is carried out by an electrical contractor we can introduce and coordinate. You have one point of contact, not five.